Contact Information

Caribbean Civil Group Ltd.
#74 Thompson Boulevard
P. O. Box N-8511
Nassau, Bahamas

(242) 325-6357
(242) 325-6356
www.caribbeancivilgroup.com
RRMcKenzie@caribbeancivilgroup.com


Project Gallery

 

 

Caribbean Civil Group


Engineering Disciplines:
Civil Engineering
Transport Engineering


Key Personnel:

Ray R. McKenzie, Principal
PROFESSION: Civil/Transportation Engineer
YEARS OF EXERIENCE: 25+ Years
NATIONALITY: Bahamian
TEAM LEADER EXPERIENCE:CCG Team Leader with over 18 years of leading engineering

[ Download CV ]


Core Services:
Civil and Transportation Engineering


Experience:

Project Name & Location: Airport Gateway Project
New Providence, Bahamas
Project Type: Design-Build Capital Infrastructure Project
Project Capital Cost: US$72 Million
Project Schedule: 2010 - 2013
Project Description/Role:
Caribbean Civil Group was the design engineer or record (EOR) with oversight of the entire civil design including the 24inch primary water main. The project consisted of the reconstruction of approximately 6 miles of major highway from the airport leading into a central business district area (CBD). The project encompassed capital works such as a comprehensive drainage system (deep wells and retention pond) both urban (curb inlets & deep wells) and rural (swales & retention ponds) and the determination of the drainage spread rates for the roadway.

Project Name & Location: Baha Mar Development Mega Resort
New Providence, Bahamas
Project Type Design-Bid-Build Capital Infrastructure Project
Project Cost US$90 Million
Project Schedule 2011 - 2012
Project Description/Role:
Responsible for engineering design, specifications and calculation report review, sign and seal construction issue documents. Project Engineer of Record (EOR), which included but was not limited to shop drawings review and acceptance, site monitoring and observations and as-built review and acceptance. Responsible for the verification of QA-QC process and water main monthly reports for project duration.

Reconstruction of approximately 3.5 miles of major dual carriageway roadway; West Bay Street to accommodate the mega resort. The project encompassed capital works such as pavement design, paving, concrete works, earthworks, drainage system, street lighting, electrical low/high voltage and telecommunications utilities, sidewalks, landscaping, 16, 20 & 24 inch potable and reuse water main, gravity sanitary sewer and 20 inch force main, lift stations, roadway geometrics, detailed specifications and seven roundabout intersection design.

Project Name & Location: Airport Gateway Project
New Providence, Bahamas
Project Type: Design-Build Capital Infrastructure Project
Project Capital Cost: US$60 Million
Project Schedule: 2010 - 2013
Project Description/Role:
Engineer of Record (EOR) responsible for the management of the installation of the 24 inch water main. Reconstruction of approximately 6 miles of major highway and construction of 6 miles of new highway from the airport leading into a CBD area including installation and commissioning of a 24 inch potable water main (PVC) along with telecommunications, cable and electrical infrastructure.

Project Name & Location: Mariposa Resort Development
Treasure Cay, Abaco, Bahamas
Project Type: Private Resort Infrastructure Design
Estimated Project Capital Cost: US$5 Million (Stage I/Phase I)
Project Schedule: 2009 - 2010
Project Description/Role:
Responsible for management and coordination of the planning and infrastructural design.
Design of subdivision infrastructure including civil, potable water distribution and sanitary sewer system including gravity sewer main, forcemain, liftstation and pump selection.

Project Name & Location: Royal Island Development
Royal Island, Eleuthera, Bahamas
Project Type: Private Resort Subdivision Infrastructure Design and Construction
Project Capital Cost: US$700 Million
Project Schedule: 2006 - 2007
Project Description/Role:
Responsible for coordination and EOR duties of the infrastructural design.
Engineer of Record for the Royal Island Project which consisted of major capital infrastructural works. CCG’s responsibility included design review and approval of potable and reuse water distribution system, RO Plant and sanitary sewer works that included but was not limited to gravity sanitary sewer system, grinder pumps, force main and lift stations.

 


Post a review or comment about this professional